The HYT team led by Musa were able to complete the work successfully. This was possible because of the strong relationships. The team was so cooperative with the school administration and the community and even trained some of the local youths in construction using ISSB. The team showed high levels of discipline, specifically towards the safety of young children from the construction site. We are very pleased with the interlocking bricks because of their attractive appearance and for their multi purpose capabilities allowing them to be opened up for seminars and prayer as well as teaching. Previously, some of our children would study beneath trees due to overcrowding, but now they can continue to study indoors and not be affected by the rain.